Air pressure and buildings
Air tightness refers to the continuity of a buildings fabric and its ability to retain air (and heat), it is measured in terms of an air leakage rate through the building's envelope. Air pressure might be described as the force exerted by air on any surface in contact, in a unconfined, confined or compressed space. Air tightness is measured with reference to a certain air pressure, normally given as 50 pascals, in a building this is approximately the pressure exerted on a fabric if a 20 mile an hour wind is blowing on all of its side sides at the same time.
at a given reference pressure (usually 50 pascal) divided by the: Heated building volume V. At 50·Pa, it is called the air change rate at 50 Pa and usually noted n50(units: h−1).
, air pressure and air flow in buildings are all related but also. .. of air or any other fluid is caused by a pressure differential between two points.
Flow will originate from an area of high energy, or pressure, and proceed to area(s) of lower energy or pressure.
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.




















